China Energy Conservation and Environmental Protection Group's project in Gansu Yemen

The total installed capacity of Yumen 50 MW wind solar complementary power generation project is 50 MW, mainly including 50 MW photovoltaic array area, inverter, and expansion of main transformer of Changxi 30KV booster station. As there are wind power projects that have been put into operation by other companies in the plant area where Yumen Project is located, when applying for projects in the plant area, it is required to reflect the comprehensive utilization of resources and apply for projects as "complementary scenery".

Guangdong High Power Technology Co., Ltd. provides production+installation services for the 35kV epoxy resin cast insulated tubular bus project. This product is waterproof, fireproof, corrosion resistant, earthquake resistant, and has excellent performance in preventing low temperature condensation. The layout is simple and beautiful! The epoxy resin cast solid insulated tubular bus is a new generation of bus products. It has been introduced from abroad for more than 20 years. With mature technology and excellent performance, it can guarantee zero fault for 30 years!

  • Gansu_Yumen_35kV_Busbar.jpg